Bring the current load and actual building instructions into one handover record. The entry contact and receiver need the route as well as the furniture list.
On this page
Finish and label the complete load
Count packed boxes, identify heavy or fragile contents and label groups for their receiving rooms. List every prepared furniture section and detached fitting.
Keep the full-route quote record current, including any declared extra collecting address. Tell Customer Services as soon as you add furniture or learn that its measurements have changed. If this happens on moving day, call Customer Services to discuss what can be arranged.
Prepare furniture and shared-area access
Protect prepared sofa sections and keep fittings together. Complete the clearance sheet and confirm any required building protection with the manager.
Optional packing and unpacking, item disassembly or item assembly at any agreed stop require eligible provider availability and agreement. Loading help is distinct. Agree the work and time for each relevant stop. Confirm the work actually booked. Packing and unpacking share one service selection, time allowance and rate.
Arrange both complete entry handovers
Finish the street-and-building record and access sequence. Confirm who answers the collection entry system, receiving keys and help at both ends.
Give each contact the permitted furniture route and room placement. Tell support about changed lift access, load or fixed slots before relying on the earlier plan.
The sofa and room-labelled boxes have one receiving plan
Illustrative example: an Ilford customer protects a prepared sofa and labels boxes by room. The entry contact has the permitted lobby and lift route.
The receiving keyholder has checked the hallway and final doorway and remains available through placement. Both contacts work from the current load and access instructions.
Use a flat-load and admission checklist
- Inventory complete and boxes labelled by room.
- Prepared sections protected and fittings identified.
- Permitted furniture route and building requirements ready.
- Lawful stops, entry contacts and fixed slots confirmed.
- Receiving keys, placement and both-end help available.
FMMV allocates a suitable vetted provider after booking and supports the booking to completion. Use the London planning guide for wider questions.
Common questions
Should the entry contact have the furniture route?
Give them the permitted door, lift or stair arrangement and current load list, with availability through collection.
Does loading help include dismantling the sofa?
No. Loading help does not automatically include dismantling the sofa. Request the actual disassembly task at any agreed moving stop, subject to eligible provider availability. Give the sofa parts and tools required and book its time separately in 30-minute blocks of elapsed team time at the booking rate.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Ilford move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Ilford move