Confirm access for the whole carrying sequence. Expected pickup arrival does not establish when the sofa and boxes will be delivered into the receiving room.
On this page
Confirm the actual collection slot and admission
Ask the manager which furniture entrance, lift arrangement and shared-area requirements apply on the date. Confirm who answers the entry system throughout collection.
Tell Customer Services as soon as you know of a fixed start time, access closing time or keyholder departure. A booked building slot and a pending street request must be recorded separately.
Check receiving keys and whole handover availability
Confirm when the receiving home can admit the load and any appointment or key-return limit. Ask who stays while unloading and the complete internal carry are finished.
Prepare furniture and boxes before the agreed collection readiness point. Report an unconfirmed lift, changed receiver or missing key through support rather than relying on a provisional sequence.
Connect every stage with the fixed limits
Include the load check, agreed preparation, lobby and vertical carry, loading, travel, unloading and final room placement. Add any declared extra stop and its own release arrangement.
Use the street-and-building record and arrival terms with support. A pickup-arrival expectation is different from completed delivery before a building closes; review compatibility across the whole job.
The receiving slot must cover carrying inside
Illustrative example: an Ilford customer gives support the collection lift arrangement and a fixed receiving-building limit. Both entry contacts confirm availability for the full handover.
The sofa’s lobby, lift and hallway route is included with the boxes. The plan checks completed receiving work rather than only the drive between addresses.
Keep a complete building-access sequence
- Furniture route, lift arrangement and entry contact confirmed.
- Load and agreed preparation ready.
- All building access periods and keyholder availability and any key-handover deadlines supplied early.
- Receiving admission and help available through completion.
- Full collection-to-room sequence reviewed through support.
Finish the flat preparation plan and London scheduling checks.
Common questions
Does pickup arrival guarantee delivery within my building slot?
Tell Customer Services the fixed receiving limit as soon as you know it and describe the complete carry. Arrival at pickup and completed delivery are different stages.
Who should answer the entry system while we load?
Arrange an authorised contact available throughout the handover, with the actual furniture entrance and access instructions.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Ilford move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Ilford move