An entry system and a floor number do not describe the whole job. Join the lawful street position, lobby, vertical route and final room doorway to the inventory before choosing space and help.
On this page
Give the complete prepared load
List the sofa, other furniture and packed boxes, including detachable sections and fittings. Give the largest travelling piece’s dimensions and identify heavy or fragile contents.
Declare any other collection with its own address, load and release person. A flat label does not establish how much vehicle space the belongings need.
Identify the entrance that serves the home
Pegasus describes one Ilford High Road scheme as two residential blocks around a courtyard with retail frontage. For your own flat, ask the occupier or manager which residential entrance and furniture route actually apply.
Record the carry from the lawful stop, lobby turn, lift or stairs, corridor and final doorway. Use the prepared-sofa clearance sheet and give any part needing a different route.
Confirm the receiving home and selected help
Check the receiving route in the same prepared furniture state, with keys and an admission contact ready. Choose help for loading and unloading based on both complete carries.
Include known building requirements when you request a price. Tell Customer Services about a new requirement or fixed slot as soon as you know it. Use How pricing works with the street-and-building admission record to keep the work description complete.
The lobby turn belongs in the quote brief
Illustrative example: an Ilford customer lists a sofa, chair and boxes. They confirm the residential door and prepared sofa dimensions, then describe the lobby turn and actual lift arrangement.
The recipient checks the new hallway in the same state. Both routes and the chosen help go into the price request.
Keep a full-route flat quote record
- Complete load and prepared furniture dimensions.
- Actual residential entrance and admission contact.
- Street, lobby, lift/stairs, corridor and final doorway.
- Receiving keys and route checked.
- Date, fixed building limits and help at both ends.
Finish the flat preparation plan and London quote checks.
Common questions
Is the building name enough to identify collection?
Give the actual residential entrance, person admitting the team and furniture route to the flat with the full address.
Should I include a corridor after the lift?
Describe the complete route through the corridor and final doorway, not only the lift or floor number.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Ilford move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Ilford move