Skip to main content
← Patchway

A receiving-route record for each prepared piece

Patchway furniture fit before the new-home handover

Possession of the new-home keys does not establish that the largest prepared piece can reach its intended room.

Editorial review:

Get actual door, turn and level information before relying on delivery. Match it to the prepared item and independently check the collection path, permissions and sufficient help.

On this page

Identify the furniture in the form it will travel

Record dimensions including protection, loose sections and available weight information. Note what remains assembled and who will complete appropriate preparation. Include fittings, instructions and other goods travelling with the furniture so capacity and parts are not lost from the brief.

The prepared-furniture assessment method helps organise useful measurements and photographs. Refer unusually heavy goods, specialist needs and uncertain suitability to support before relying on the move.

Obtain the actual receiving route before treating it as settled

Ask the responsible property contact for the intended furniture entrance, outside levels, doorway openings, stair landings or permitted lift and final-room turns. If you cannot inspect before handover, explain which measurements or permissions remain unresolved rather than assuming a development’s appearance supplies them.

The January 2022 draft study describes interwar rows, Radburn-style green-space settings in northern Patchway and different newer house types around Charlton Hayes. Identify your actual home and complete approach. None of those dated forms supplies a doorway dimension, current private consent or usable key arrangement.

Check collection independently and agree any preparation

Measure the complete collection exit, including room and hall turns, stairs, shared doors, gates and outside path to lawful loading. A piece already inside the old home can still need preparation to leave it; receiving fit is a separate assessment of the same prepared piece.

Hypothetical example: a table clears the collection doorway intact, but its protected width and the new-home landing turn remain uncertain. Send the dimensions and whole receiving route to support before relying on collection. Do not remove a building fixture or infer suitability merely because keys have been released.

Connect fit, services and people to a completed room delivery

Packing/unpacking share one selection, allowance and rate. These tasks and item disassembly/assembly may be separately agreed at any declared stop subject to eligible provider availability, in 30-minute elapsed team-time blocks at the booking rate apart from loading, without duplicate travel. Supply materials unless otherwise agreed in writing. Choose enough selected help for both complete carries/loading/unloading and relevant stops; with customer loading, provide sufficient suitable people throughout both ends.

Before booking, tell support about seller appointments, keyholder availability and any key-handover deadlines, building access periods and facility access periods. Allow time to gain access and check all goods and their parts. Finish any remaining agreed preparation before carrying the items that need it. Include the complete collection carry and loading, travel and the work at every agreed stop. At delivery, allow for entry, unloading and carrying everything into the final rooms, followed by placement and any selected finishing. Arrival is not completion. Keep the goods-entrance permissions and preparation checklist with wider access guidance.

Common questions

Can I settle furniture fit from the property’s development name?

No. Obtain the actual receiving entrance and full route to the room, including openings, turns, outside levels and any permitted lift. Match those facts to the prepared piece and tell support which details remain unresolved before relying on delivery.

Should I wait until unloading to mention an unknown landing turn?

No. Give support the uncertainty, prepared dimensions and available route information before relying on the move. Ask the property contact for the missing details and agree any preparation or suitability assessment before the affected items are carried.

Sources and further detail

Patchway collection readiness connected to actual new-home keys, goods admission and completed receiving-room delivery. The January 2022 draft study supplies dated layout context only; it establishes no property permission, key release or furniture fit. Examples are hypothetical.

Bring the Patchway key and room arrangements together

Include the complete load, collection release, actual receiving entrance and sufficient help through finished room delivery.

Plan your Patchway move