Skip to main content
← Patchway

A load, keys and receiving handover checklist

Prepare a Patchway move around actual receiving readiness

Prepare the goods and the receiving responsibilities together, so the load is not ready to leave while nobody can admit it at the new home.

Editorial review:

Keep the selected inventory and parts record beside the key collector, receiving opener and helper plan. Check them again when access changes and reconcile the same goods in the final rooms.

On this page

Select every travelling group and declared collection

List furniture, boxes, bags and loose components in all selected rooms and outside places. Identify what stays behind and any purchased goods with their own seller address, release contact and prepared form. Do not treat a purchase as an unrecorded addition to the household load.

Give prepared bulky dimensions, packaging and available weight information. Keep fittings and instructions labelled with the correct item. The receiving-route record helps identify preparation or measurements still needed.

Prepare the load before its carrying route is needed

Agree what will be packed or appropriately disassembled, by whom and at which stop. Keep ready goods out of the doors, stair turns and outside route needed by the remaining pieces. Leave keys, documents and immediate essentials accessible.

Packing/unpacking share one selection, allowance and rate. These tasks and item disassembly/assembly may be separately booked at any declared stop subject to eligible provider availability, in 30-minute elapsed team-time blocks at the booking rate apart from loading, without duplicate travel. Prepare other work yourself and supply appropriate materials unless otherwise agreed in writing. The furniture preparation method supports the item record.

Assign key collection, opening and enough carrying help

Confirm the person who obtains the new-home keys and the person who opens the actual receiving door. Check any communal entrance, vehicle gate or manager appointment separately, with the lawful position and full room route. Keep the collection opener and any seller release contact reachable.

Select sufficient help through both full carries/loading/unloading and relevant stops; with customer loading, provide enough suitable people throughout both ends. A helper collecting keys cannot also be assumed present carrying goods. Give seller release appointments and deadlines, keyholder availability and any key-handover deadlines, building access periods and facility access periods to support before booking, and use the release-to-room sequence to test the duties.

Check readiness before release and reconcile at receipt

Allow time to gain access and check all goods and their parts. Finish any remaining agreed preparation before carrying the items that need it. Include the complete collection carry and loading, travel and the work at every agreed stop. At delivery, allow for entry, unloading and carrying everything into the final rooms, followed by placement and any selected finishing. Arrival is not completed delivery.

Hypothetical example: the furniture and boxes are ready, but the named receiving helper is also collecting keys elsewhere. Correct the roles and receiving arrangement with support before relying on departure. Check the full list before collection ends and match the same goods and fittings in the receiving rooms. Report changed access or discrepancies through the booking arrangements and keep Bristol scheduling guidance with the plan.

Common questions

What should stay accessible while I pack?

Keep keys, keyholder contacts, documents, immediate essentials and the inventory/parts record accessible. Do not pack the information needed to admit or identify the goods into a box that cannot be reached during the handover.

What if the named helper must leave to collect the keys?

Reassign the duties or arrange sufficient selected or customer carrying help through the whole operation. Tell support about the changed key and receiving arrangements promptly; do not count someone elsewhere as available for unloading and the complete room carry.

Sources and further detail

Patchway collection readiness connected to actual new-home keys, goods admission and completed receiving-room delivery. The January 2022 draft study supplies dated layout context only; it establishes no property permission, key release or furniture fit. Examples are hypothetical.

Bring the Patchway key and room arrangements together

Include the complete load, collection release, actual receiving entrance and sufficient help through finished room delivery.

Plan your Patchway move