The same cabinet can require different work if its prepared form or permitted exit changes. Report what is now travelling and the complete new route before relying on the original booking; a changed carry does not by itself establish a named local supplement.
On this page
Identify what changed in the load or exit
Compare every furniture item, box, shelf, panel and fixing with the accepted inventory. Give quantities, starting locations and actual prepared dimensions for additions. If the cabinet remains assembled, provide its current size and outstanding preparation rather than retaining the smaller section measurements.
Describe a different garden gate, authorised rear route, internal stair, lawful position or receiving room with the full carry it creates. A new transport address is an additional stop with its own goods, contact and access. Use the whole-load quote brief to show the original and actual work.
Agree the optional task and stop explicitly
Packing/unpacking, item disassembly and item assembly can be agreed at any declared moving stop, subject to eligible provider availability. Packing and unpacking share the existing packing selection, allowance and rate. Give the actual task, items, agreed stop and responsibility for preparation the customer or seller will complete.
These tasks are separate from loading and unloading help. Selected services use 30-minute blocks of elapsed team time at the booking rate, not per person or duplicate travel. Agree materials, tools, any specialist requirement and selected time before work begins; include that work within the applicable access period.
Separate changed scope, additional time and external arrangements
A changed inventory or route may require a revised booking. Separately, check the shown half-hourly additional-time rate for work beyond booked time in How pricing works and your booking information. Ask support what is included and how the changed job is being assessed before agreeing more work.
Check applicable external parking or journey charges for the actual arrangements, keeping them distinct from team working time. A private access decision is not itself a transport fee. Report changed seller release, keys, building or facility limits promptly and update the permission record and connected timing.
Keep an original-and-revised work record
Hypothetical example: a Carrbrook customer originally describes cabinet panels leaving through an agreed rear route. The occupier later confirms that route is unavailable and the cabinet remains assembled. The customer sends the actual dimensions, authorised front exit and full carry to support and requests any eligible disassembly separately.
- Original and actual goods, prepared form and stops.
- Old and new permitted exits, positions and complete carries.
- Requested task, agreed stop, tools or materials and selected time.
- Booked allowance, shown additional-time rate and relevant outside charges.
Recheck the whole-job timeline, use Manchester cost guidance for the wider comparison and contact Carrbrook booking support with the changed facts. Detailed change conditions remain in the booking terms.
Common questions
Does selecting loading help include dismantling the cabinet?
No. Loading help does not automatically include item disassembly. Specify the cabinet, parts, tools and declared agreed stop, subject to eligible provider availability, and agree separate 30-minute blocks of elapsed team time at the booking rate.
Does a longer garden carry automatically create a parking charge?
No. Report the revised carrying work and check any actual external parking charge separately. The extra carry does not by itself establish a council charge or a named moving supplement.
Sources and further detail
Individually researched local guidance; examples hypothetical; historic context does not establish current permission.
Ready to plan your Carrbrook move?
Use the complete load, both routes and confirmed arrangements to check your move price.
Plan and price your Carrbrook move