Keep the building name with the vehicle approach, furniture entrance and room labels. One current handover record helps the load reach the right door and receiving room.
On this page
Settle the load and actual building instruction
List everything travelling, agree preparation responsibilities and confirm the exact block, apartment and release contact. Obtain the current instruction for the moving date from your own occupier or manager.
Use the quote brief and admission record. Declare additional stops with their loads and contacts rather than adding them during collection.
Prepare pieces before the access period
Pack and label boxes by receiving room, protect prepared sections and secure fittings with their item. Keep the measured corridor, lift approach and furniture door usable as boxes are grouped.
Optional packing and unpacking, item disassembly or item assembly at any agreed stop require separate agreement and eligible provider availability. They are distinct from loading help. Agree work and time for each relevant stop. Packing and unpacking share one service selection, time allowance and rate.
Check both contacts and current instructions
Finish the route sheet and two-building sequence. Check keys, any required registration and the contact who opens the actual entrance throughout collection.
Give the recipient the parts list and final-room labels. Report a changed lift, entrance or appointment to support before relying on the previous instructions, and keep essentials and documents with you.
The block name travels with the room labels
Illustrative example: a Kidbrooke apartment resident labels packed boxes by receiving room and groups the protected desk sections. Their current note identifies the block and agreed furniture door.
Both contacts know the full handover period and the recipient is ready to identify placement. Loose fittings stay labelled to the desk.
Finish a current apartment handover checklist
- Full load and preparation responsibilities agreed.
- Block, apartment and actual entrances confirmed.
- Protected sections, fittings and room labels ready.
- Routes, contacts, keys and fixed access limits checked.
- Changes reviewed before the moving window.
FMMV allocates a suitable vetted provider after booking and supports the booking to completion. Keep wider London planning checks with your record.
Common questions
Should boxes be ready before the building slot begins?
Complete agreed packing and preparation beforehand so the access period can cover the actual carrying and loading.
What should the receiving contact be given?
Share current dimensions, the included-parts list, room labels and the agreed access and placement plan.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Kidbrooke move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Kidbrooke move