Skip to main content
← Hammersmith

Counted cartons and authorised release handover

Hammersmith moving preparation guide

Prepare for your Hammersmith move by checking the full inventory, who can open each address and how the load will reach the van. For a shop collection, confirm who can release the goods.

Editorial review:

Complete the release checks before the moving window. Give the people at collection and delivery the same inventory and the current entrance details.

On this page

Confirm the release list and authority

Check every carton and loose section supplied with the purchase. Obtain the business’s reference, release instructions and contact for any discrepancy. Confirm the complete order is ready and record the travelling dimensions of bulky packages.

Agree the retailer’s handling point and any preparation responsibility. Arrange optional paired packing and unpacking, item disassembly or item assembly explicitly at any agreed moving stop, subject to eligible provider availability. Loading help alone does not include these extras. Choose separate service time in 30-minute blocks of elapsed team time at your booking rate; packing and unpacking share the same service time and rate.

Prepare the actual goods-door instructions

Give the full business address, authorised release door and any separate entrance street or private admission instruction. Include the staff/team handover point, internal floors and carrying route where relevant. Keep the package route sheet with the list.

Confirm the lawful vehicle position separately using the loading-and-release record. Have the goods and relevant contact ready for the actual loading arrangement.

Complete the receiving handover

Confirm the recipient’s keys, actual entrance, final room and full unloading route. Tell Customer Services about a building appointment as soon as you know the time, and keep the contact reachable.

The release-to-home plan joins the appointments. If another purchase collection or transport stop is required, disclose it with its own load, contact and access rather than adding it when the van arrives.

Both contacts use the complete carton list

Illustrative example: a Hammersmith customer confirms a boxed table-and-chair order, its reference and all cartons with the retailer. The goods contact has the current release instructions; the recipient has measured the largest carton and has keys.

The handover uses that full record, including protected loose parts and the final room. A product name alone is not left to stand for an unchecked order.

Finish the counted-release checklist

  • Complete carton list and any loose sections confirmed.
  • Collection contact confirmed, with any required release reference or authorisation ready.
  • Prepared dimensions and handover responsibilities agreed.
  • Actual goods door, lawful stop and full carry recorded.
  • Receiving keyholder, route and final room ready.

FMMV allocates a suitable vetted provider after booking and supports the booking to completion. Keep the London planning guide for wider checks.

Common questions

What should the retailer contact have ready?

The complete prepared goods list, required release reference or authority and current goods-door instructions, including the agreed handover point.

Can another collection be included in the delivery?

Declare it before booking with its load, address, release contact and access, or ask support for an amendment. Confirm the complete transport arrangement before relying on it.

Sources and further detail

Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.

Ready to plan your Hammersmith move?

Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.

Plan and price your Hammersmith move