Keep the seller’s rear access and the recipient’s building period available through the complete moving work.
On this page
Give fixed limits before choosing the booking
Ask when the seller can release the goods, who opens the rear gate and how long they can stay through collection. Obtain the recipient’s keys, building admission period and any lift or facility limit independently. Tell support which seller, keyholder and building periods are fixed before booking.
Confirm a working contact at each address and how the team finds the actual entrance. A postal frontage and an expected arrival time are not a full access arrangement.
Build the sequence through the receiving room
Include checking all goods and parts, any agreed preparation, the rear-room carry, gates and outside approach, then complete loading. Add every collection or other agreed stop and travel. Receiving work starts with admission and includes unloading, stairs or lift, the final doorway and placement in the intended room.
Include selected assembly or unpacking inside that access period. Packing/unpacking share one selection, time allowance and rate. They and item assembly/disassembly may be agreed at any stop, subject to eligible provider availability, in separate 30-minute elapsed-team blocks at the booking rate alongside ordinary moving time.
Keep access and help available for completion
Expected pickup arrival is not the time the seller can assume collection is finished. Gates and contacts must remain available through checking, preparation, the full carry and loading. Likewise, arrival outside a receiving block is not delivery completion.
If selecting customer loading/unloading, arrange sufficient people for both full carries and any relevant extra stop. A seller or keyholder opening the door may not supply the lifting help needed for an upstairs flat.
Report a changed rear route or building period
Tell support promptly if the rear gate, preparation or receiving keys change. Reconcile the whole sequence with both contacts before moving another appointment. Read the applicable arrival and delay terms and change terms with your booking information. Distinguish revised work, the shown additional-time rate and applicable outside costs.
Hypothetical example: rear collection and a receiving lift period
A buyer collects a sideboard through a Northenden rear gate for a flat with a fixed lift period. Before booking, they supply the seller’s availability, the complete load and both routes. They include all checking, rear carrying, loading and travel before the receiving lift and final-room work rather than matching only the expected pickup time to that period.
Your output is one contact-and-sequence note with fixed limits and selected work visible. Use the chronological handover guide and Manchester scheduling guidance to review the arrangement.
Common questions
Does reaching the receiving building mean delivery is complete?
No. Admission, unloading, the full route to the intended room and selected receiving work still need time.
Can I give a fixed lift period after booking?
Give it before booking so the full sequence can be assessed; report any later change promptly to support.
Sources and further detail
Individually researched local guidance; examples hypothetical; historic context does not establish current permission.
Ready to plan your Northenden move?
Use the complete load, both routes and confirmed arrangements to check your move price.
Plan and price your Northenden move