Supply every seller, keyholder, checkout, building and facility deadline before booking. The sequence must cover checking, selected services, complete carries, loading, all travel and stops, unloading and the final agreed room work.
On this page
Give every recipient independent keys and limits
For each declared delivery, confirm the actual inventory, room route, keys, earliest entry and any building, lift, unloading or facility closing limit. Agree the stop sequence with support using all periods; do not assume that the second recipient’s availability can follow any finish time at the first address.
Ask what a managed appointment covers and retain the contact through final placement and any selected unpacking or assembly. Align street conditions with the position-and-admission records. Give all fixed limits before booking, leaving unresolved keys or permissions pending until a workable arrangement is agreed.
Follow the whole collection and split receiving sequence
Connect checking, agreed packing or furniture preparation, the complete room-to-vehicle carry, loading, all travel and declared stops, then unloading and the final-room carry at every recipient. Include shared doors, landings, outside steps and opening contacts as actual stages.
Include selected packing/unpacking, disassembly or assembly where it is agreed at any declared stop, subject to eligible provider availability. Packing and unpacking share one selection, allowance and rate; selected services use separate 30-minute blocks of elapsed team time at the booking rate. Arrange sufficient people at collection and every receiving address if choosing customer loading and unloading. Expected pickup arrival is not finished clearance or completed delivery.
The second recipient’s appointment constrains the whole plan
Hypothetical example: two Chorlton housemates share a collection entrance but move to different addresses. One recipient has keys during a fixed period; the other has a building appointment and requests desk assembly.
They give both loads, complete routes, contacts and selected tasks before booking. The collection contact remains available through loading, and the sequence is reconciled through both receiving handovers. They resolve an incompatible period rather than choosing arrival solely because the shared home is open.
Keep a shared-exit-to-last-room timetable
Keep all load-readiness and opening contacts, actual street and private periods, agreed stops, selected help and completion limits in order. Include every check, service task, carry, loading stage, journey leg, unloading stage and receiving room, marking what is still pending.
Use it in the owner-and-recipient handover plan and check the latest requested or confirmed collection details against the arrival terms. If a property handover is involved, arrange its checkout and key return independently using the rental handover checklist. Manchester scheduling guidance develops the connected-window method.
Common questions
Can the first Chorlton housemate take the only shared-door key when they leave?
Arrange a continuing authorised opening contact and the keys needed through the full collection before that departure. Give any fixed departure or access limit to support before booking.
Does the first delivery being available settle the second handover?
No. Each recipient needs an agreed load, route, keys and usable period covering their full carry and selected services, within the complete agreed stop sequence.
Sources and further detail
Individually researched local guidance; examples hypothetical; historic context does not establish current permission.
Ready to plan your Chorlton move?
Use the complete load, both routes and confirmed arrangements to check your move price.
Plan and price your Chorlton move