Start with the largest or least flexible travelling section and trace it from its room to the lawful stop. Check doors fully open, the whole landing and the independent route into the receiving room.
On this page
Confirm the travelling section before measuring fit
Agree whether the cabinet, table or bed travels assembled or in sections, and who prepares it. Record the largest section, projections, fragile features and any known unusual weight or manufacturer information. Keep doors, shelves and fixings labelled with the correct piece.
Use the prepared-furniture route checklist for assessment details. A width comparison does not prove a section can make the complete turn; send photographs with measurements where fit is unresolved.
Locate the residential route and outside changes of level
Camden’s 2011 West End Green appraisal records mansion flats above shops and land rising northwards. At the particular property, identify the actual residential door, starting room and current shared admission, with stairs or permitted facilities confirmed.
Measure the clear door opening with the door fully open, then the landing, corridor and entire stair turn. Include outside steps or gradient independently from internal floors. If lower-ground access is proposed, confirm that usable door and its turns rather than assuming the street frontage describes it.
Repeat the same section’s assessment into the final room
Have the recipient check the same prepared piece through their entrance, hallway, stairs or permitted lift opening and interior, then the final-room doorway. Obtain current keys and manager instructions where applicable. Choose assistance for the shared residential route, any outside levels and the whole receiving-room carry. If selecting customer loading and unloading, arrange sufficient people throughout at both properties.
Keep shared escape access clear and agree any preparation or alternative route before collection. The building-arrangements checklist helps identify the current admission contact; the appraisal does not establish a lift or private permission.
The panel clears the doorway but still needs the landing checked
Hypothetical example: a West Hampstead customer prepares a cabinet into sections. The least flexible panel is compared with the fully open residential doorway and complete landing turn.
The customer records the outside steps and full carry, then has the recipient check that same panel into the final room. Any unresolved turn is sent for assessment before collection is fixed.
Keep a limiting-piece route sheet
- Actual prepared form, largest section and labelled parts.
- Residential door and current admission contact.
- Fully open doorway, whole landing and stair-turn measurements.
- Outside steps, gradient, lawful stop and complete carries.
- Independent receiving-room assessment and unresolved questions.
Attach it to the whole-load quote brief and space-and-admission record, with London access guidance.
Common questions
Does clearing a West Hampstead doorway prove the cabinet can leave?
Check the entire landing, corridor and stair turn for its actual prepared section, then continue through outside levels to the lawful stop.
What should access photographs show?
Show the actual open doorway, complete turn and changes of level with measurements, so the prepared-piece route can be assessed before booking.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your West Hampstead move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your West Hampstead move