Identify where the van will work and who controls that position. Confirm the current building approach, gate and clearance independently from public-road loading or a council suspension.
On this page
Choose the actual working position and controller
Record the street or private loading area, exact bay or marked position and intended activity. Ask management whether the vehicle enters the development and which furniture door it serves, rather than giving only a pedestrian meeting point beside a dock.
Include the allocated vehicle details when available and check relevant clearance with the controller. Record the remaining carry through courtyards or steps even when the proposed position is inside the building boundary.
Check current loading restrictions and any suspension
Southwark’s loading guidance requires checking the actual signs, restrictions and activity. Continuous loading and a longer period of parking are different arrangements; ask the council which permission fits the intended use rather than assuming furniture work creates an exemption.
Its suspension guidance covers reserving an identified space for removal or loading activity. Follow the current application and confirmation instructions, retaining the precise location, dates and vehicle conditions. Refer a red-route position to its actual controller separately.
Obtain the current gate and furniture-door agreement
A council arrangement does not grant entry to a private development or authorise a particular lift. Ask the building contact for vehicle admission, standing position, clearance, access contact and the accepted furniture route.
Confirm any moving appointment, fob or gate-opening responsibility through the whole operation. Use the prepared-piece route sheet and make independent street and building arrangements at delivery.
The walking entrance is not the working position
Hypothetical example: a Surrey Quays resident usually reaches the flat on foot through a development. Management identifies a different gate and agreed loading position for the actual vehicle.
The customer checks whether any public-street arrangement is also needed and retains the manager’s admission instructions beside the furniture-door route. Neither permission is treated as a substitute for the other.
Keep a street-and-building admission record
- Exact working position, controller and current signs.
- Applicable loading arrangement or approved suspension.
- Authorised vehicle entrance, relevant clearance and conditions.
- Gate contact, furniture door and remaining carry.
- Independent receiving arrangements and confirmed amendments.
Match the permissions with the two-building timetable and London access guidance.
Common questions
Does a Southwark suspension authorise a Surrey Quays development gate?
Obtain private vehicle admission, clearance and the accepted furniture route from the building controller separately.
Can I give the pedestrian entrance as the vehicle meeting point?
Confirm the actual vehicle approach and lawful working position with management, then describe the complete carry to the furniture door.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Surrey Quays move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Surrey Quays move