Keep every contact working from the same agreed stop sheet. Preparation should make each collection ready for the booked sequence, including parts held elsewhere and the recipient’s complete load.
On this page
Agree the whole journey before preparing appointments
List all collection and delivery addresses, their order and the items handled at each one. Obtain the seller or keyholder’s release agreement and confirm the receiving keys and intended rooms. Mark any fixed limit before choosing the moving window.
Use the combined-load quote brief to settle inventory, access and help. The London multi-stop checklist provides the wider stop-by-stop method.
Label goods and parts by collection stop
Pack boxes securely and mark them with the stop and receiving room. Prepare furniture in its agreed travelling form, identify every section and keep fixings with the relevant item. If parts are at another home, show that clearly on both contacts’ lists.
Agree preparation responsibilities and any separately booked optional task for each declared collection stop, subject to eligible provider availability. Work selected for one item or stop does not automatically cover the others. Tell support about a changed item, preparation task or stop before relying on the existing scope.
Reconfirm each entrance and contact
Before moving day, check the actual garden gate, room exit and lawful loading position at each Neasden home. Ask the relevant person to keep the agreed carry usable and be available to open shared or private access throughout that collection. Reconfirm the chosen help for each collection and the combined receiving load; with customer loading and unloading, arrange sufficient people for every full carry.
Reconfirm the recipient’s route and room space for the combined load. Keep the contacts’ release periods together using the connected-window plan, including any changed keys, building appointment or completion limit.
Parts at the second home remain identifiable
Hypothetical example: a Neasden customer collects bed-frame sections at one home and boxes with a labelled fixing bag at the next. Both contacts carry the same item reference, with the fixing bag assigned to the second stop.
The recipient uses that record at delivery to reconcile all sections and fittings. The sequence is prepared before collection rather than relying on the driver to discover which home holds missing parts.
Check each completed stop and the final rooms
At each pickup, identify the agreed goods and explain any change before loading. Reconcile that stop’s list with the releasing contact before leaving, keeping the remaining addresses and their contacts available. Let the provider assess the load arrangement between stops.
At delivery, maintain authorised access through unloading and the final room carry. Check all stop-labelled goods and parts against the combined list and report any issue through booking support. FMMV allocates a suitable vetted provider after booking according to the requirements and availability.
- All stops, contacts and release arrangements confirmed.
- Prepared goods and parts labelled to their stop.
- Each collection list reconciled before departure.
- Final-room load checked against the whole inventory.
- Changes or issues raised through booking support.
Use London scheduling guidance to keep the handovers connected.
Common questions
Who should hold the combined inventory?
Give the releasing contacts the relevant stop list and ensure the recipient has the complete shared record.
Should I combine boxes from both homes without labels?
Label their collection stop and receiving room so release and final handover can be checked against the agreed inventory.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Neasden move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Neasden move