Prepare the full goods and actual entrances, then keep one itinerary and item list through release, every declared stop and completed delivery.
On this page
Before booking, identify the endpoints and complete load
Record the actual block, flat or room and furniture entrance at collection and delivery. List boxes, furniture and large personal belongings, with prepared dimensions, parts and available weight information. Separate goods staying behind and identify who prepares and releases the travelling load.
Confirm receiving keys and the independent final-room route. Declare every additional collection, delivery or key stop with its address, contact and period. Give seller appointments and goods-release deadlines, tenancy handover deadlines, keyholder availability and any key-handover deadlines, building access periods, and facility access periods to support before booking.
Keep preparation, parts and access instructions usable
Pack and label work assigned to you, identify sections and fittings by item and destination and retain available instructions. Keep keys, fobs, current building-door instructions and both contacts outside the packed load. Obtain the actual permitted route rather than rely on a generic complex meeting point.
The paired packing and unpacking service, item disassembly and item assembly may be agreed at any declared moving stop subject to eligible provider availability. Packing/unpacking share one selection, allowance and rate; optional services use separate 30-minute blocks of elapsed team time at the booking rate apart from loading/unloading. Supply materials unless agreed otherwise in writing; drivers bring standard tools, with specialist tools agreed beforehand.
Reconfirm positions, complete carries and carrying people
Keep the lawful vehicle positions and separate private admission current. Confirm the whole internal and outside room routes with the contacts who open them. Choose help throughout both complete carries and relevant stops; customer loading and unloading needs sufficient people throughout at both ends, independently of access-only contacts.
Connect entry and checks of the goods and parts, remaining preparation, all carries and loading, every stop and travel, entry at delivery and unloading, final-room placement and selected finishing. Keep contacts and keys available through the relevant operation. Expected pickup arrival is not the time delivery ends.
At collection, match goods to the current building instruction
Hypothetical example: a Hunslet customer moves a desk, mattress, bicycle and boxes. The occupier confirms the actual block and furniture door, and the customer checks the agreed goods and parts before carrying and loading those items. The recipient has the same list and its own assessed room route, with any necessary key stop declared.
If the entrance, item form or key arrangement changes, contact support promptly with the original and actual facts. Review capacity, access, help, tasks, stops and timing before relying on a substituted plan. Update any separate permission with its issuer too.
Finish the same inventory after receiving-room work
Keep authorised entry, keys and chosen help available through unloading, the complete final-room carry and selected finishing. Match every agreed item and part against the release record after the work and raise a difference promptly through support. Retain the building contact and relevant handover notes with the booking reference.
Use the actual-building quote record and keys and completed-work timetable. Leeds scheduling guidance connects the wider periods. Bring the final brief to Hunslet man and van; a suitable vetted provider is allocated after booking according to requirements and availability.
Common questions
Where should the correct-door instructions be kept?
Keep them accessible with the booking details, keys and opening contact, not packed in the load. Identify the actual block and furniture route and share updated instructions promptly if they change.
When is the receiving item check finished?
Match the agreed goods and parts after unloading, the full room carry and selected finishing, while access and the relevant contacts remain available. Arrival at the complex or reception is not completed room receipt.
Sources and further detail
Actual building and furniture entrance, complete routes and keys through final room; hypothetical examples labelled.
Plan your Hunslet move
Bring the complete load and both access routes together for your move price.
Plan and price your Hunslet move