Follow the real travelling shape through its room exit, shared close, turns and full vehicle carry, then repeat that check at delivery. Permission to use a door or lift still needs a separate fit and handling assessment.
On this page
Describe the pieces in the form that travels
Give the largest height, width and depth with projections and remaining protection. Identify the mattress, desk top, frame sections, shelves and fixing bags alongside the main item. Supply available weight or manufacturer information and flag fragile material or unusual handling needs before choosing help.
State what remains assembled and who finishes preparation. Removing drawers does not necessarily change the outer frame, and a long desk top can remain the limiting piece. Keep photographs and instructions with the item record; the furniture route-assessment method explains how to present the whole turning space.
Trace the actual residential furniture route
Identify the dwelling door independently of any ground-floor shop, office reception or similar frontage. Follow each prepared shape through internal doors, shared close, landings, stairs or a permitted suitable lift, corridors and outside stages to lawful loading. Record fixed rails, door swings and steps where they affect a turn.
Measure a lift’s usable opening and interior, then the landing and final doorway beyond it. Ask who opens controlled doors and whether entry can remain available through repeated carries. A building’s historic conversion or a broad flat description cannot establish its present internal route.
Repeat the assessment into the final room
Ask the recipient to check the same prepared piece through the actual unloading position, entrance, stairs or accepted lift, corridor and receiving-room door. Confirm private permission for each proposed alternative and give the whole route for assessment. More vehicle capacity or carrying help cannot by itself settle an unresolved fit.
Select enough assistance through both complete carries and relevant stops, including outside levels and final-room work. With customer loading/unloading, arrange sufficient suitable people throughout at both ends. Keep the receiver and keyholders separate from people who have agreed to carry.
Agree preparation before moving the item
Packing/unpacking share one selection, allowance and rate. Those paired tasks, item disassembly and item assembly may be agreed at any declared stop, subject to eligible provider availability, using separate 30-minute blocks of elapsed team time at the booking rate apart from ordinary loading/unloading, not per person or duplicate travel. Specify the item, task, stop and selected time. Supply materials unless otherwise agreed in writing, share instructions and agree specialist tools beforehand.
Give seller appointments, keyholder availability and any key-handover deadlines, checkout deadlines, building access periods and facility access periods to support before booking. Allow time to get in and check all the goods and their parts. Finish any remaining agreed preparation before carrying the items that need it. Include the full collection carry and loading, the journey and every agreed stop. At each delivery, allow for access, unloading and carrying the goods into their agreed final rooms, and place them there before any selected finishing work. Arrival is not completed delivery; the Leith timetable keeps those operations inside their access periods.
Keep one item-and-route record through the handover
Hypothetical example: a Leith desk frame is prepared, but its top remains too long for a shared landing turn on the proposed route. The resident provides the top’s actual dimensions and turn photographs for assessment, while the recipient checks its own room entrance. Neither relies on dismantling the frame as proof that every section fits.
Record the item’s prepared form, associated parts, limiting measurements, permitted route, selected help and unresolved assessment. Keep the working-position and admission record beside it and give the accepted arrangement to Leith man and van.
Common questions
Can I assume the lift or communal entrance will be available?
No. Confirm permitted use and continued entry with the building contact, then check the actual prepared piece through the lift opening/interior, landings, corridors and room door or accepted stairs. A booking or lift appointment does not establish fit or override the building’s current conditions.
Where should I check the local rules for Leith?
Ask the occupier or manager about the actual furniture door, controlled stages, lift or stairs, permitted route and current clearance requirements. Check the public working position separately through Edinburgh’s guidance. Bring both sets of instructions and the limiting item measurements together for support’s assessment.
What should I do if the move details change?
Send support the revised prepared dimensions, parts, doorway or full route, with photographs where useful. Reassess suitability, sufficient help, preparation and receiving fit before relying on the earlier arrangement. Reconnect any altered carry or selected task to the fixed access limits and update both property contacts.
Sources and further detail
Practical guidance for the actual load and property routes. Examples are hypothetical; confirm current council and premises instructions.
Bring your Leith plan together
Use the agreed load, complete routes and connected handovers when arranging your move.
Leith booking options