Skip to main content
← Frenchay

Two openers and a complete work sequence

Schedule a Frenchay collection around keys and the goods entrance

Put the goods-release contact and receiving opener on one plan before deciding how a separate key collection will fit.

Editorial review:

Work back from the receiving admission and finished-room requirements, then connect collection release, preparation and the actual vehicle itinerary. Tell support all fixed limits before booking.

On this page

Separate opening the building from releasing the load

Name the person who may release the declared goods and the person controlling the furniture entrance. They may be different contacts. Confirm any managed-door appointment, barrier instruction or building limit that affects the work. At delivery, ask who can open the property and keep the route available until the selected work is complete.

Give seller release appointments and deadlines, manager-confirmed access periods, keyholder availability and any key-handover deadlines, building access periods and required completion times at delivery to support before booking. The collection arrival window is not a promised finish at the receiving room. The admission record helps keep street and private arrangements separate.

Resolve the keys without assuming another van journey

If keys are collected elsewhere, establish who collects them, when they become available and how the destination will open. Keep a separate customer errand alongside the moving sequence. If the moving vehicle genuinely needs another stop, declare its full address, purpose, access and effect on the load before relying on the itinerary.

Hypothetical example: a customer collects keys from an office while an authorised person releases the furniture at Frenchay. That plan still needs an available receiving opener and sufficient carrying help; the moving vehicle should not be expected to visit the office unless that stop is agreed.

Include preparation before the work that depends on it

Start with collection admission, item and parts checks and any remaining agreed packing or furniture preparation. Packing/unpacking share one selection, allowance and rate; those tasks and item disassembly/assembly may be separately agreed at any declared stop, subject to eligible provider availability, using 30-minute blocks of elapsed team time at the booking rate.

Continue through every room and outside carry, loading, all stops and travel, receiving admission, unloading, the full stair or permitted-lift route, final-room placement and selected unpacking or assembly. Arrival is not completed delivery. Describe the actual gates and goods door rather than substituting a historic Frenchay path description for the route you will use.

Check attendance through the finished handover

Choose sufficient loading help for the whole operation. With customer loading/unloading, provide enough suitable people throughout both complete carries and every relevant stop. A manager opening a door and a customer collecting keys are not automatically available to handle the goods. Settle any gap before relying on the planned sequence.

Keep a practical record of the release contact, goods-door opener, preparation duties, vehicle itinerary, receiving opener, help and final-room finish. Use the preparation and release plan for the last check, and Bristol scheduling guidance for connected appointments. Report changed limits or availability to support promptly.

Common questions

Can collection start before the new keys are available?

Discuss the whole arrangement with support before booking. Establish a receiving destination, its opener and sufficient help, and give the actual fixed limits; an expected key time does not confirm admission or finished delivery. Do not rely on the goods remaining loaded until access becomes available.

Is the manager’s opening slot enough time to plan the job?

No. Check whether it covers the actual permitted preparation and complete release carry and loading, then connect all stops and travel between addresses with receiving admission, unloading, final-room placement and selected finishing. Give the slot and any other fixed limits to support before booking.

Sources and further detail

The permitted furniture entrance and independently checked receiving route for the actual Frenchay addresses. March 2007 conservation-area descriptions are historic context, not present admission or fit. Examples are hypothetical.

Book around the Frenchay entrance you will use

Bring the complete goods list, opening contacts and both room routes together with the preparation and help required.

Plan your Frenchay move