A keyholder meeting the van starts access. Confirm the chosen exit stays usable through the collection and the recipient can complete placement and selected finishing.
On this page
Obtain the real opening and completion limits
Confirm when the collection rooms and permitted side or front exit can be used, who opens secure doors or gates and when access must end. Ask when the furniture will be prepared and all parts available for checks.
At delivery, obtain keys, any building or permitted-lift period and the time the whole receiving operation must finish. Give fixed seller, keyholder, building and facility limits to support before booking, with each unanswered access question clearly identified.
Include the work before the last item reaches the van
Connect admission, goods and parts checks and remaining agreed preparation to every indoor and outside carry, gate and turn before loading is complete. Furniture in a rear room is not already at the working position simply because the side gate is open.
Select help for the complete routes. With customer loading and unloading, arrange sufficient people throughout collection, delivery and every relevant stop. A gateholder or receiving keyholder may provide entry only; confirm physical help separately.
Carry the sequence into the actual final rooms
Include all stops and travel, receiving admission, unloading, outside stages, stairs or a permitted lift, final-room placement and selected unpacking or assembly. For a ground-floor receiving room, check outside steps and gate stages too. Expected pickup arrival is not completed collection or delivery.
If a contact must leave before that full operation can finish, discuss the conflict before booking. Include independently arranged storage only as an explicit stop with its own goods, entrance, complete route and receiving period.
Place preparation and finishing in the correct part of the plan
Packing/unpacking, item disassembly and item assembly may be agreed at any declared moving stop, subject to eligible provider availability. Packing/unpacking share one selection, allowance and rate; optional work uses separate 30-minute blocks of elapsed team time at the booking rate, apart from loading/unloading. Put preparation before the carry that needs it and finishing within the receiving period.
Tell support promptly about changed exits, furniture readiness, helpers or keys. Review revised work, time beyond the booking at the shown half-hourly rate and applicable outside costs separately using how pricing works, while checking the complete revised sequence.
Hypothetical example and your exit-to-room timetable
Hypothetical example: a Smethwick customer’s side gate can be opened early, but the table still needs agreed preparation and the recipient has a fixed finish. The customer gives support both limits and the complete work through room placement and selected assembly before booking, rather than treating the first gate meeting as a completed collection.
Record readiness, permitted exit, opening contacts, earliest usable entry, required finish, all work stages, selected help/services and unresolved dependencies for each stop.
Common questions
Does an open gate settle the collection window?
No. Confirm admission through checks, preparation, every complete carry and loading, with enough chosen help independently of whoever supplies the gate key.
Does a pickup window establish a delivery finish?
No. Give support the complete collection, stops and travel, receiving carry and selected finishing, with any fixed receiving limit, before booking.
Sources and further detail
Individually researched local guidance; examples are hypothetical. Confirm current address-specific arrangements.
Plan your Smethwick move
Bring the complete load and both access routes together for your move price.
Plan and price your Smethwick move