Confirm when the team may use the actual furniture routes and who can admit it. Connect that access with preparation, full collection and the receiving property before booking.
On this page
Confirm preparation and complete release
Agree when the table, fragile pieces and boxes are ready and who completes preparation. Name the authorised opening contact and confirm availability through checking, preparation where agreed and the last carry.
Record fixed seller, departure, clearance or key-return limits separately from expected vehicle arrival. Include each additional stop’s goods, contact and opening or facility period.
Confirm what the moving period actually covers
Ask which entrance and routes the furniture may use and whether any lift, protection or supervision arrangement has a confirmed period. Establish whether the limit concerns arrival or completed use of the shared route.
Keep the position-and-building record aligned with actual street use and private admission. Have the recipient confirm keys and their own building period independently.
Plan through all item routes and final placement
Connect checking, preparation, every outside and inside carry, loading, all stops, travel, unloading and final placement. Include pieces using stairs separately from those taking a permitted lift. With customer loading and unloading, arrange sufficient people for both complete carrying jobs.
Give all fixed seller, keyholder, building or facility limits to support before booking and discuss conflicts. Arrival terms concern pickup arrangements, not completed delivery. Use London scheduling guidance for the wider sequence.
The tabletop and boxes share an admission period but different routes
Illustrative example: a South Kensington building confirms a furniture-admission period. Boxes use a permitted lift while the prepared tabletop follows an agreed stair route.
The customer gives both carries and the recipient’s key limit before booking. The full sequence includes preparation, loading and delivery rather than treating the first admitted box as completion.
Keep a building-to-room sequence
- Prepared goods, fragile readiness and release contact.
- Actual entrance, lift and stair-use periods.
- Street arrangement and private admission confirmations.
- Receiving keys and every fixed building or facility limit.
- All work through placement, selected help and conflicts.
Use it in the fragile-load handover plan.
Common questions
Is admitting the team enough to satisfy a moving window?
Ask whether the building period limits entry or completed route use and plan all relevant carrying and loading accordingly.
Can I connect building appointments using driving time alone?
Include preparation, every item-specific carry, loading, all stops and full delivery into the receiving rooms.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your South Kensington move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your South Kensington move