Start with fixed release and receiving limits before choosing the slot. A vehicle’s expected arrival at the driveway is not the completed collection, and arrival at storage is not final unit placement.
On this page
Confirm the release and receiving constraints first
Ask when the home and all outside stores can be opened and the complete load will be ready. Record any seller release, key handover or building limit that applies to the actual collection, along with the person who maintains access.
For storage, confirm the allocated unit, vehicle admission, any lift appointment and the time by which unloading and the final unit carry must finish. For a home, confirm receiving keys and any fixed building period. Give all fixed limits, including any extra-stop facility deadline, to support before booking and leave unresolved access pending.
Include checks and preparation before the driveway carry
Plan opening the home and garage, checking every listed item, prepared section and fixing and completing any remaining agreed preparation. Allow for any separately booked preparation at the agreed stop before carrying and loading begin.
Continue through travel and every declared stop, its admission and work, then receiving entry, unloading and the final room or unit carry. A usable vehicle position does not remove the time needed to retrieve goods along a stepped or sloping route.
Maintain both contacts through completion
The collection contact needs to release the whole load and keep all agreed routes open until loading ends. The receiving contact must provide authorised admission and continued access through final placement, including a permitted lift or corridor route where relevant. Choose assistance for every house, garage and receiving-unit carry in the sequence. Customer loading and unloading requires sufficient people throughout at both ends, including the stepped or sloping approaches.
Read the arrival terms and keep estimated pickup arrival distinct from delivery completion. If a key time, driveway arrangement or facility period changes, tell support promptly with the connected effect.
The unit deadline follows two collection routes
Hypothetical example: a Purley customer sends a cabinet from the house and boxes from the garage to storage. The collection includes an entrance step and a separate garage carry, while the unit has a fixed unloading completion limit.
The customer supplies those stages before selecting the booking window. If the period does not fit, a compatible facility arrangement needs agreement rather than assuming a driveway collection is immediate.
Keep a complete property-to-destination timeline
- Load, sections and fixings checked; remaining agreed preparation included.
- Seller, keys, building and facility limits where applicable.
- House and garage carries, loading, all stops and travel.
- Receiving admission, unloading and final room or unit completion.
- Contacts, alternatives and unresolved access questions.
Use London scheduling guidance for wider dependencies. Reconcile the position arrangement with the preparation sequence.
Common questions
Does a storage closing time need to include the corridor carry?
Ask when the whole delivery into the allocated unit must finish, not only when vehicle entry ends.
Should garage collection appear in the timing brief?
Include every starting location’s complete carry, preparation and opening contact before choosing the window.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Purley move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.