Obtain both buildings’ actual access limits before selecting transport. An estimated pickup arrival does not show when the furniture will leave the shared stair or reach its final receiving room.
On this page
Obtain the fixed seller, key and building limits
Ask when the complete load can be released, who opens the furniture entrance and when the collection route must be clear again. Include any actual lift reservation, shared-area preparation or moving period confirmed by the building contact.
At delivery, confirm keys, earliest admission and the time by which unloading and final-room carrying must finish. Add any seller or facility deadline at another declared stop. Give all fixed limits to support before booking and leave unconfirmed permission pending.
Include checks and preparation before the shared carry
Plan opening the property, checking every furniture section, accessory and fixing against the agreed list and completing any remaining agreed preparation. Include separately booked eligible work where relevant before carrying through the outside and communal stages and loading.
Continue through travel, every additional stop and its handling, receiving admission, unloading and final room placement. Allow the assessed sequence to determine whether the appointments are compatible; the vehicle’s expected arrival is only one point in that work.
Maintain admission for the whole collection and delivery
The collection contact must be able to release all agreed goods and keep doors or shared access usable until loading is complete. The recipient needs to maintain the accepted receiving route through the final carry, not merely meet the vehicle. Plan the selected help for both full routes; if choosing customer loading and unloading, arrange sufficient people at each end.
Read the arrival terms and distinguish estimated pickup arrival from completed delivery. Report a changed lift period, key time or manager instruction promptly so support can reassess the connected window.
A receiving lift slot ends before the whole job can fit
Hypothetical example: a Pimlico customer has a collection from a square-fronting flat and a fixed receiving lift slot. The load includes a prepared bed and cabinet with separate outside and communal carrying stages.
The customer gives those full routes and the receiving completion limit before booking. If the periods do not align, an alternative building arrangement is needed rather than assuming the drive is the whole move.
Keep a door-to-final-room timeline
- Complete load, sections and fixings checked; remaining agreed preparation included.
- Seller release, keys and fixed building or facility limits.
- Outside and shared carries, loading, travel and all stops.
- Receiving admission, unloading and final-room completion.
- Available contacts, agreed alternatives and unresolved permission.
Use London scheduling guidance for wider dependencies. Reconcile the street and building arrangements with the preparation plan.
Common questions
Does the receiving lift slot need to include unloading?
Confirm what the manager requires and plan the whole receiving carry through the final room within the accepted arrangement.
When should fixed building limits be reported?
Before booking, alongside all collection, keyholder, seller and receiving constraints.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Pimlico move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Pimlico move