Confirm the people who can open the actual route before selecting the window. A person at the home may not control a separate gate or shared entrance between it and the lawful loading point.
On this page
Identify every entrance contact needed
Walk the route with the occupier and identify any locked gate, shared door or managed entrance. Confirm who can open each one and when. Keep the actual flat or house keyholder distinct from someone who can only admit visitors to a shared area.
Where a manager controls a moving appointment or lift, track its confirmation and any remaining conditions. The building-arrangements guide helps record those actual requirements without assuming they apply to every home.
Confirm the load and approach are ready together
Agree when furniture will be in its prepared form and boxes packed. Check that the selected pedestrian route and lawful meeting point match the access description for that period. Keep directions available to the person meeting the team.
Use the confirmed position record if a loading arrangement is involved. A pending street request or an expected gate key is not yet a confirmed arrival plan.
Connect the collection contacts to the recipient
Confirm receiving keys, the final room and its full unloading route. Share any fixed receiving appointment through support before booking, including the time needed to carry the load after arrival.
Collection, loading, travel and delivery follow each other. An estimated pickup arrival does not guarantee completion before a receiving deadline. The London scheduling guide helps consider those connected stages.
The occupier has the flat key but another person opens the gate
Illustrative example: a Gipsy Hill occupier can release a cabinet and boxes, while a separate contact opens a shared gate on the agreed route. The recipient also needs to confirm the new home’s keys.
The customer brings those contacts and the prepared load into one sequence before discussing the collection window. They do not rely on the flat key alone to establish access from the vehicle.
Keep a keyholder-to-recipient sequence
- Home keyholder and prepared load ready.
- Separate gate or shared-entrance contacts confirmed.
- Actual lawful meeting point and route available.
- Receiving keys, room and carry checked.
- Fixed dependencies and changes shared through support.
Use the arrival handover checklist to assign preparation, and the change record if an entrance or meeting point changes.
Common questions
Is the flat keyholder always enough to confirm collection access?
Check any separate gate, shared entrance or managed access on the actual route, and confirm who opens it during the moving window.
What if the receiving keys depend on another appointment?
Give that dependency to support before booking and include unloading and the final room in the sequence, not only arrival outside the destination.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Gipsy Hill move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Gipsy Hill move