Moving-day coordination guide

Ealing moving-day scheduling

Choose a time for your Ealing move when someone can open both properties. Allow for the full carry, including any stairs, and flag any fixed lift or building appointment before booking.

Editorial review:

Check when the van can load, when your furniture can leave and when the recipient will have the keys. If you need a lift slot, confirm its hours with the building manager.

On this page

Settle the furniture route before fixing the sequence

Measure the largest piece in its travelling form through the lobby, lift doors and cabin, exit turn and flat entrance. Ask the manager which moving entrance and lift can be used and when.

Use the property guide to settle the full route. If the intended lift is unavailable, discuss the actual checked alternative before building the day around it.

Align separate access arrangements

Confirm the actual road position and authorised period through the loading guide. Obtain any building appointment separately; a suspended bay does not reserve the lift.

Give the opening contact the proposed arrival information and agree how they will be reached. At delivery, check the recipient’s keys, moving entrance and any lift period independently.

Allow for all of the handling work

Include the remaining carry between the van and building, every box and furniture part, and the delivery route. Give the booking team both properties’ confirmed constraints when selecting available arrangements.

The arrival terms explain estimated arrivals. A narrow building slot needs discussion before booking; an estimated vehicle arrival should not be treated as a guaranteed lift appointment.

Two flats need compatible moving periods

Illustrative example: an Ealing flat has an agreed moving lift period, while the recipient needs a caretaker to open the delivery goods door.

The customer checks the prepared sofa through both routes, confirms each contact and shares both access periods with the complete load. The booking team can review an available arrangement against the actual work.

Keep a two-property access timetable

  • Largest-piece route and travelling form confirmed.
  • Collection moving entrance, lift period and contact.
  • Lawful road position and separate authorisation.
  • Full load, help and carrying work at both ends.
  • Receiving keys, access period and opening contact.

The London scheduling guide develops wider moving-day coordination. For changes to your plan, see the guide to changes that can affect your price.

Common questions

Does a booked lift period guarantee the van’s arrival time?

No. The van’s arrival time is an estimate. Give FMMV the lift slot before booking so the team can discuss timing for the full load.

What if the receiving flat has a different moving period?

Confirm both periods and opening contacts, then give them to the booking team with the complete load and both carrying routes.

Sources and further detail

Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.

Ready to plan your Ealing move?

Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.

Plan and price your Ealing move