Choose a window from the actual two-property handovers. Confirm who opens gates and the permitted lift or goods route, then explain fixed dependencies to the booking team alongside estimated arrival.
On this page
Confirm the current moving period and opening contact
Ask the collection building contact which entrance serves the move and whether it has an appointment, gate-opening requirement or other admission instruction. Keep the response tied to the exact flat and moving route.
Have the complete belongings ready, including packed cupboard and balcony-store contents where included. Complete agreed furniture preparation separately so the selected collection activity can follow the confirmed route.
Join the street arrangement to private admission
Where a public bay is needed, check Southwark’s current process before choosing the moving date. Use the actual approved position and period with the building’s admission plan.
Confirm private gate, yard or lift arrangements independently. The loading guide helps you prepare those checks with the controller, while the building-access guide helps organise the request.
Resolve the recipient’s keys and room route
Confirm when the receiving property can admit the move and who meets it. Include its own entrance, any building appointment and the full carry to the room rather than assuming it follows the collection arrangements.
Give both fixed periods and carrying work to the booking team. The arrival terms explain estimated arrival, and the London scheduling guide supplies the wider dependency method.
Gate opening meets the receiving-key period
Illustrative example: a customer collects a prepared sofa and boxes from a Bermondsey flat. The authorised route uses a gate opened by a building contact, while the recipient has a separate key appointment.
The customer confirms both handovers and lawful stops before choosing the arrangement. If either contact’s period changes, support receives the revised dependency so the setup and availability can be reviewed.
Keep one connected admission record
- Current collection entrance, gate contact and moving period.
- Complete ready load and preparation agreed.
- Approved street position and any private admission.
- Receiving keys, room route and meeting contact.
- Both fixed dependencies and changes supplied to support.
Use Bermondsey preparation to organise packing and final handover once those decisions are known.
Common questions
Is a lift appointment enough to set the whole moving window?
Connect it with gate or building admission, lawful loading positions, collection readiness and the recipient’s keys.
Who should open a private gate for the move?
Confirm the authorised opening contact with the current building manager and retain that arrangement with the moving period and entrance instructions.
Sources and further detail
Practical planning for the actual addresses. Historic built context does not establish present permission; examples are illustrative.
Ready to plan your Bermondsey move?
Bring the complete inventory, access record and confirmed appointments together to check the service and your move price.
Plan and price your Bermondsey move